Sleek Silver Dual-Drawer Storage Solution for Small Areas

Customization: Available
Capacity: 130L
Door: Double Doors

Product Description

Basic Specifications

Model NO.BR005-150SI
InstallationBuilt-in
TypeCompact
Power SourceElectricity
MaterialStainless Steel
Temperature TypeDouble-Temperature
Defrost TypeAuto Defrost
CertificationETL / DOE / CEC
Product Dimensions22.6"D X 23.4"W X 34.3"H
Voltage115 Volts
Capacity4.9 Cubic Feet
ColorSilver Stainless Steel

Why Choose This Model

Dual-Drawer Storage
Sleek Silver Design

Under Counter Double Drawer Refrigerator

304 stainless steel dual-drawer outdoor fridge for patios, kitchens, and bars. This professional cooling solution holds up to 21 wine bottles and 70 cans with weatherproof durability.

● Dual Drawer Storage

Two independent drawers with self-locking rails (50 kg load each) for wine, cans, or food.

● Outdoor-Grade Construction

304 stainless steel housing and wear-resistant seals ensure weatherproof durability.

● Stable Cooling System

360° air duct system ensures frost-free, even cooling across all compartments.

● Easy Digital Control

Touch panel with real-time temperature display ranging from 37–65 °F (3–18 °C).

Product Details & Features

Packaging & Shipping

Packaging Info
Package Size68.00cm * 66.00cm * 97.00cm
Package Gross Weight52.000kg
Transport PackageCarton

Frequently Asked Questions

Are you a manufacturer or a trading company?
We are a manufacturing and trading company, and we are one of the top manufacturers of ice machines and cooling equipment, serving customers worldwide.
Can we put our own logo on the machine?
Yes, we support OBM, ODM, and OEM services to meet your specific branding requirements.
What is your product warranty?
The warranty period is typically 12-24 months depending on the specific product. We also provide installation guidance and spare parts.
What is the after-sales service system?
We have a professional after-sales team providing technical support year-round. We utilize over 180 overseas warehouses globally to coordinate and handle service requests efficiently.
Do you test the machines before they leave the factory?
Yes, every machine passes through three rigorous tests: incoming inspection, in-line inspection, and final inspection. Testing videos can be provided upon request.
What is the production lead time?
Lead time depends on the quantity, generally requiring about 45 days for production. If the model is in stock, shipping can be arranged immediately upon payment.

Related Products